A blue–green deployment installs a release on a second, idle set of hosts (green) while the current set (blue) serves, then switches traffic to green at once; switching back is the rollback, the return to the previous release, which a blue–green deployment makes a switch rather than a reinstallation.
Quantitative Finance · Glossaire
Qu'est-ce que « Blue–green deployment, rollback » ?
Aussi appelé : blue--green deployment · rollback