सभी किताबें

पेशेवर

1 Markets I: The Ecosystem and Exchange-Traded Marketsबाज़ार ऑनलाइन 2 Markets II: Rates, FX and Creditबाज़ार ऑनलाइन 3 Markets III: Commodities, Energy and Cryptoबाज़ार ऑनलाइन 4 Quantitative Methodsविधियाँ ऑनलाइन 5 Derivatives and Volatilityडेरिवेटिव्स ऑनलाइन 6 Rates, Credit, XVA and Riskब्याज दरें, क्रेडिट और जोखिम ऑनलाइन 7 Research Craft: Predictors, Backtests, Measurement, Portfoliosअनुसंधान ऑनलाइन 8 Strategies I: Equities and Futuresरणनीतियाँ ऑनलाइन 9 Strategies II: Volatility, Relative Value, Macro and the Bank Desksरणनीतियाँ ऑनलाइन 10 Microstructure and Executionनिष्पादन ऑनलाइन 11 Market Making and High-Frequency Tradingमार्केट मेकिंग ऑनलाइन 12 Machine Learning for Marketsमशीन लर्निंग ऑनलाइन 13 Low-Latency Softwareतकनीक ऑनलाइन 14 Networks, Hardware and Trading Infrastructureतकनीक ऑनलाइन 15 Research, Data and Risk Platformsतकनीक ऑनलाइन 16 The Desk and the Firmफ़र्म ऑनलाइन 17 The Industry: Firms, Roles and Careersकरियर ऑनलाइन 18 Interviews I: Maths, Probability and Speedकरियर ऑनलाइन 19 Interviews II: Markets, Trading Games and the Final Roundकरियर ऑनलाइन 20 Interviews III: Codeकरियर ऑनलाइन
ऐप्स परिचय Coach लॉग इन पढ़ना शुरू करें

Economics · शब्दावली

Learning curve क्या है?

Definition 14.11 High School Economics · अध्याय 14 — Production and Costs

A learning curve relates the cost, or the labour hours, of producing one unit to the cumulative number of units produced so far. It is often summed up by the fall in cost for each doubling of cumulative output: an 80 % curve cuts the cost by 20 % each time cumulative output doubles.

अध्याय में पढ़ें →
Definition 10.11 University Economics — Year 1 · अध्याय 10 — Cost Minimisation

A learning curve relates unit cost to cumulative output XX, the total produced so far: c(X)=c0X−bc(X) = c_0X^{-b} with b>0b > 0. Each doubling of cumulative output multiplies unit cost by 2−b2^{-b}; the learning rate is 1−2−b1 - 2^{-b}, the percentage fall in cost per doubling.

A learning curve with a learning rate of 18\% (b = 0.2863): unit cost falls by 18\% at each doubling of cumulative output, a curve on linear axes and a straight line on logarithmic ones. The points are the weekend problem’s battery plant.
A learning curve with a learning rate of 18%18\% (b=0.2863b = 0.2863): unit cost falls by 18%18\% at each doubling of cumulative output, a curve on linear axes and a straight line on logarithmic ones. The points are the weekend problem’s battery plant.
अध्याय में पढ़ें →