全部书籍

专业

应用 关于 Coach 登录 开始阅读

书籍暂未推出简体中文版——当前显示英文版。

Quantitative Finance · 术语表

什么是 Dynamic VWAP?

Definition 16.6 Microstructure and Execution · 第 16 章 — Benchmark Algorithms

A dynamic VWAP schedule recomputes, after each interval, the quantity left over the intervals left in proportion to an updated forecast of their volume, instead of fixing the whole schedule before the open.

VWAP slippage of a 15 000-share buy against its schedule part, one point per simulated day. The dashed line is slippage equal to the schedule part; the points sit about 0.7 tick above it, the execution part’s spread and impact. Data: mx_algos.vwap_study.
Figure 16.3. VWAP slippage of a 15 000-share buy against its schedule part, one point per simulated day. The dashed line is slippage equal to the schedule part; the points sit about 0.7 tick above it, the execution part’s spread and impact. Data: mx_algos.vwap_study.
在原文中阅读 →