सभी किताबें

पेशेवर

1 Markets I: The Ecosystem and Exchange-Traded Marketsबाज़ार ऑनलाइन 2 Markets II: Rates, FX and Creditबाज़ार ऑनलाइन 3 Markets III: Commodities, Energy and Cryptoबाज़ार ऑनलाइन 4 Quantitative Methodsविधियाँ ऑनलाइन 5 Derivatives and Volatilityडेरिवेटिव्स ऑनलाइन 6 Rates, Credit, XVA and Riskब्याज दरें, क्रेडिट और जोखिम ऑनलाइन 7 Research Craft: Predictors, Backtests, Measurement, Portfoliosअनुसंधान ऑनलाइन 8 Strategies I: Equities and Futuresरणनीतियाँ ऑनलाइन 9 Strategies II: Volatility, Relative Value, Macro and the Bank Desksरणनीतियाँ ऑनलाइन 10 Microstructure and Executionनिष्पादन ऑनलाइन 11 Market Making and High-Frequency Tradingमार्केट मेकिंग ऑनलाइन 12 Machine Learning for Marketsमशीन लर्निंग ऑनलाइन 13 Low-Latency Softwareतकनीक ऑनलाइन 14 Networks, Hardware and Trading Infrastructureतकनीक ऑनलाइन 15 Research, Data and Risk Platformsतकनीक ऑनलाइन 16 The Desk and the Firmफ़र्म ऑनलाइन 17 The Industry: Firms, Roles and Careersकरियर ऑनलाइन 18 Interviews I: Maths, Probability and Speedकरियर ऑनलाइन 19 Interviews II: Markets, Trading Games and the Final Roundकरियर ऑनलाइन 20 Interviews III: Codeकरियर ऑनलाइन
ऐप्स परिचय Coach लॉग इन पढ़ना शुरू करें

Quantitative Finance · शब्दावली

Extrinsic value, rolling intrinsic क्या है?

अन्य नाम: extrinsic value · rolling intrinsic

Definition 16.7 Rates, Credit, XVA and Risk · अध्याय 16 — Commodity and Energy Derivatives

The extrinsic value of a facility is its value above the intrinsic, from the right to change the schedule as prices move. The rolling intrinsic strategy captures part of it: re-optimise the schedule on each new forward curve and re-hedge the difference, never losing the intrinsic already locked in.

The illustrative forward curve (left axis) and the intrinsic plan’s inventory at the end of each month (right axis): fill in the cheap summer months, empty in the dear winter ones. Data: the chapter’s tutorial.
Figure 16.3. The illustrative forward curve (left axis) and the intrinsic plan’s inventory at the end of each month (right axis): fill in the cheap summer months, empty in the dear winter ones. Data: the chapter’s tutorial.

उदाहरण

Example 16.9 (A season of storage)

A facility of 1 million MMBtu (ten units) starts and ends the April–March year empty; it can inject two units a month and withdraw four, at 2 cents per MMBtu each way. On the curve of Example 16.2 the intrinsic plan injects two units a month from April to August and withdraws in December, January and February (Figure 16.3); its value is USD 634 447. Rolling intrinsic on 4 000 simulated curves is worth USD 699 550, least-squares Monte Carlo USD 698 182: an extrinsic value of about 10% of the intrinsic at a monthly decision frequency. Daily decisions, which a fast facility can take, add more.

अध्याय में पढ़ें →