सभी किताबें

पेशेवर

1 Markets I: The Ecosystem and Exchange-Traded Marketsबाज़ार ऑनलाइन 2 Markets II: Rates, FX and Creditबाज़ार ऑनलाइन 3 Markets III: Commodities, Energy and Cryptoबाज़ार ऑनलाइन 4 Quantitative Methodsविधियाँ ऑनलाइन 5 Derivatives and Volatilityडेरिवेटिव्स ऑनलाइन 6 Rates, Credit, XVA and Riskब्याज दरें, क्रेडिट और जोखिम ऑनलाइन 7 Research Craft: Predictors, Backtests, Measurement, Portfoliosअनुसंधान ऑनलाइन 8 Strategies I: Equities and Futuresरणनीतियाँ ऑनलाइन 9 Strategies II: Volatility, Relative Value, Macro and the Bank Desksरणनीतियाँ ऑनलाइन 10 Microstructure and Executionनिष्पादन ऑनलाइन 11 Market Making and High-Frequency Tradingमार्केट मेकिंग ऑनलाइन 12 Machine Learning for Marketsमशीन लर्निंग ऑनलाइन 13 Low-Latency Softwareतकनीक ऑनलाइन 14 Networks, Hardware and Trading Infrastructureतकनीक ऑनलाइन 15 Research, Data and Risk Platformsतकनीक ऑनलाइन 16 The Desk and the Firmफ़र्म ऑनलाइन 17 The Industry: Firms, Roles and Careersकरियर ऑनलाइन 18 Interviews I: Maths, Probability and Speedकरियर ऑनलाइन 19 Interviews II: Markets, Trading Games and the Final Roundकरियर ऑनलाइन 20 Interviews III: Codeकरियर ऑनलाइन
ऐप्स परिचय Coach लॉग इन पढ़ना शुरू करें

Quantitative Finance · शब्दावली

Indefeasible right of use क्या है?

Definition 13.8 Networks, Hardware and Trading Infrastructure · अध्याय 13 — Long-Haul Fibre

An indefeasible right of use (IRU) is a long-term contract giving its holder the exclusive right to use specified fibres or capacity of a network for a fixed term, usually paid up front, without transferring ownership of the cable, and usually with a share of maintenance charged to the holder.

Illustrative prices, not quotes: the cumulative cost of a long-haul route bought as dark fibre (a 6-million IRU and 1.5 million of equipment up front, 0.3 million a year of operations and maintenance) and leased as a wavelength (90 000 a month). The lines cross after 9.6 years. Data: fig_fibre.py, nw_fibre.costs().
Figure 13.3. Illustrative prices, not quotes: the cumulative cost of a long-haul route bought as dark fibre (a 6-million IRU and 1.5 million of equipment up front, 0.3 million a year of operations and maintenance) and leased as a wavelength (90 000 a month). The lines cross after 9.6 years. Data: fig_fibre.py, nw_fibre.costs().
अध्याय में पढ़ें →