सभी किताबें

पेशेवर

1 Markets I: The Ecosystem and Exchange-Traded Marketsबाज़ार ऑनलाइन 2 Markets II: Rates, FX and Creditबाज़ार ऑनलाइन 3 Markets III: Commodities, Energy and Cryptoबाज़ार ऑनलाइन 4 Quantitative Methodsविधियाँ ऑनलाइन 5 Derivatives and Volatilityडेरिवेटिव्स ऑनलाइन 6 Rates, Credit, XVA and Riskब्याज दरें, क्रेडिट और जोखिम ऑनलाइन 7 Research Craft: Predictors, Backtests, Measurement, Portfoliosअनुसंधान ऑनलाइन 8 Strategies I: Equities and Futuresरणनीतियाँ ऑनलाइन 9 Strategies II: Volatility, Relative Value, Macro and the Bank Desksरणनीतियाँ ऑनलाइन 10 Microstructure and Executionनिष्पादन ऑनलाइन 11 Market Making and High-Frequency Tradingमार्केट मेकिंग ऑनलाइन 12 Machine Learning for Marketsमशीन लर्निंग ऑनलाइन 13 Low-Latency Softwareतकनीक ऑनलाइन 14 Networks, Hardware and Trading Infrastructureतकनीक ऑनलाइन 15 Research, Data and Risk Platformsतकनीक ऑनलाइन 16 The Desk and the Firmफ़र्म ऑनलाइन 17 The Industry: Firms, Roles and Careersकरियर ऑनलाइन 18 Interviews I: Maths, Probability and Speedकरियर ऑनलाइन 19 Interviews II: Markets, Trading Games and the Final Roundकरियर ऑनलाइन 20 Interviews III: Codeकरियर ऑनलाइन
ऐप्स परिचय Coach लॉग इन पढ़ना शुरू करें

Quantitative Finance · शब्दावली

Transfer latency क्या है?

Definition 16.4 Markets III: Commodities, Energy and Crypto · अध्याय 16 — Spot Markets

Transfer latency is the time between the decision to move an asset from one venue to another and the moment it can be traded at the destination: the source venue’s withdrawal processing, the chain’s inclusion and the confirmations the destination requires, and the destination’s crediting.

Probability that a cross-venue arbitrage executed by transferring the asset loses money, as a function of the transfer time, for three gaps, with 20 basis points of costs and an annual volatility of 60% (). A 50-basis-point gap loses about one time in three after an hour. Illustrative parameters. Data: the chapter’s tutorial.
Figure 16.2. Probability that a cross-venue arbitrage executed by transferring the asset loses money, as a function of the transfer time, for three gaps, with 20 basis points of costs and an annual volatility of 60% (Proposition 16.5). A 50-basis-point gap loses about one time in three after an hour. Illustrative parameters. Data: the chapter’s tutorial.
अध्याय में पढ़ें →