The critical path of a synchronous design is its slowest path from one register to the next: the delay of its logic and wiring plus the registers’ own overhead, which sets the shortest clock period the design supports. Timing closure is the work of making every register-to-register path fit within the target clock period.
বইগুলো এখনো বাংলা ভাষায় পাওয়া যায় না — ইংরেজি সংস্করণ দেখানো হচ্ছে।
Quantitative Finance · পরিভাষা
Critical path, timing closure কী?
অন্য নাম: critical path · timing closure