Semua buku

Profesional

Aplikasi Tentang Pelatih Masuk Mulai membaca

Quantitative Finance · Glosarium

Apa itu Critical path, timing closure?

Dikenal juga sebagai: critical path · timing closure

Definition 6.6 Networks, Hardware and Trading Infrastructure · Bab 6 — Programmable Hardware I: Architecture and Toolchain

The critical path of a synchronous design is its slowest path from one register to the next: the delay of its logic and wiring plus the registers’ own overhead, which sets the shortest clock period the design supports. Timing closure is the work of making every register-to-register path fit within the target clock period.

Baca dalam konteks →