सभी किताबें

पेशेवर

1 Markets I: The Ecosystem and Exchange-Traded Marketsबाज़ार ऑनलाइन 2 Markets II: Rates, FX and Creditबाज़ार ऑनलाइन 3 Markets III: Commodities, Energy and Cryptoबाज़ार ऑनलाइन 4 Quantitative Methodsविधियाँ ऑनलाइन 5 Derivatives and Volatilityडेरिवेटिव्स ऑनलाइन 6 Rates, Credit, XVA and Riskब्याज दरें, क्रेडिट और जोखिम ऑनलाइन 7 Research Craft: Predictors, Backtests, Measurement, Portfoliosअनुसंधान ऑनलाइन 8 Strategies I: Equities and Futuresरणनीतियाँ ऑनलाइन 9 Strategies II: Volatility, Relative Value, Macro and the Bank Desksरणनीतियाँ ऑनलाइन 10 Microstructure and Executionनिष्पादन ऑनलाइन 11 Market Making and High-Frequency Tradingमार्केट मेकिंग ऑनलाइन 12 Machine Learning for Marketsमशीन लर्निंग ऑनलाइन 13 Low-Latency Softwareतकनीक ऑनलाइन 14 Networks, Hardware and Trading Infrastructureतकनीक ऑनलाइन 15 Research, Data and Risk Platformsतकनीक ऑनलाइन 16 The Desk and the Firmफ़र्म ऑनलाइन 17 The Industry: Firms, Roles and Careersकरियर ऑनलाइन 18 Interviews I: Maths, Probability and Speedकरियर ऑनलाइन 19 Interviews II: Markets, Trading Games and the Final Roundकरियर ऑनलाइन 20 Interviews III: Codeकरियर ऑनलाइन
ऐप्स परिचय Coach लॉग इन पढ़ना शुरू करें

Quantitative Finance · शब्दावली

Kirk’s approximation क्या है?

Definition 16.4 Rates, Credit, XVA and Risk · अध्याय 16 — Commodity and Energy Derivatives

Kirk’s approximation prices a spread call by treating F2+KF_2+K as lognormal with volatility σ2F2/(F2+K)\sigma_2F_2/(F_2+K) and applying Margrabe’s formula:

C≈P(F1N(d1)−(F2+K)N(d2)),σK2=σ12−2ρσ1σ2b+σ22b2,b=F2F2+K.C \approx P\bigl(F_1N(d_1)-(F_2+K)N(d_2)\bigr),\quad \sigma_K^2 = \sigma_1^2-2\rho\sigma_1\sigma_2b+\sigma_2^2b^2,\quad b = \frac{F_2}{F_2+K}.
Error of Kirk’s approximation for the January–July calendar spread call against 400 000 Monte Carlo paths, by strike. The error is zero at zero strike (Margrabe is exact) and changes sign across the money; it stays under half a cent at every strike, on options worth from nothing to 1.26 dollars. Data: the chapter’s tutorial.
Figure 16.2. Error of Kirk’s approximation for the January–July calendar spread call against 400 000 Monte Carlo paths, by strike. The error is zero at zero strike (Margrabe is exact) and changes sign across the money; it stays under half a cent at every strike, on options worth from nothing to 1.26 dollars. Data: the chapter’s tutorial.

उदाहरण

Example 16.5 (A calendar spread)

A call on the January forward (3.50) minus the July forward (2.74), strike 0.50, expiring at July delivery: the model gives volatilities of 34.8% and 58.1% to that date and a correlation of 0.970. Kirk’s approximation prices it at 29.41 cents per MMBtu against 29.78 by Monte Carlo (standard error 0.01), an error of 0.38 cent; at zero strike both give about 75.8 cents, Margrabe’s value. The error is largest near the money, where the approximation of the sum’s distribution matters most (Figure 16.2).

अध्याय में पढ़ें →