সব বই

পেশাদার

1 Markets I: The Ecosystem and Exchange-Traded Marketsবাজার অনলাইন 2 Markets II: Rates, FX and Creditবাজার অনলাইন 3 Markets III: Commodities, Energy and Cryptoবাজার অনলাইন 4 Quantitative Methodsপদ্ধতি অনলাইন 5 Derivatives and Volatilityডেরিভেটিভস অনলাইন 6 Rates, Credit, XVA and Riskসুদহার, ঋণ ও ঝুঁকি অনলাইন 7 Research Craft: Predictors, Backtests, Measurement, Portfoliosগবেষণা অনলাইন 8 Strategies I: Equities and Futuresকৌশল অনলাইন 9 Strategies II: Volatility, Relative Value, Macro and the Bank Desksকৌশল অনলাইন 10 Microstructure and Executionএক্সিকিউশন অনলাইন 11 Market Making and High-Frequency Tradingমার্কেট মেকিং অনলাইন 12 Machine Learning for Marketsমেশিন লার্নিং অনলাইন 13 Low-Latency Softwareপ্রযুক্তি অনলাইন 14 Networks, Hardware and Trading Infrastructureপ্রযুক্তি অনলাইন 15 Research, Data and Risk Platformsপ্রযুক্তি অনলাইন 16 The Desk and the Firmপ্রতিষ্ঠান অনলাইন 17 The Industry: Firms, Roles and Careersক্যারিয়ার অনলাইন 18 Interviews I: Maths, Probability and Speedক্যারিয়ার অনলাইন 19 Interviews II: Markets, Trading Games and the Final Roundক্যারিয়ার অনলাইন 20 Interviews III: Codeক্যারিয়ার অনলাইন
অ্যাপ পরিচিতি Coach সাইন ইন পড়া শুরু করো

বইগুলো এখনো বাংলা ভাষায় পাওয়া যায় না — ইংরেজি সংস্করণ দেখানো হচ্ছে।

Quantitative Finance · পরিভাষা

Event variance কী?

Definition 8.7 Derivatives and Volatility · অধ্যায় 8 — Parametrising the Surface

The event variance of a scheduled announcement (an earnings release, a central-bank decision, a trial result) is the variance of the log-return caused by the announcement itself. Between two expiries that bracket the event it is the excess of total variance over what the diffusive rate of the earlier expiry would accrue: wevent=w(T2)−(w(T1)/T1)T2w_{\mathrm{event}}=w(T_2)-\bigl(w(T_1)/T_1\bigr)T_2.

At-the-money term structure of a share around its earnings release (dotted). Expiries after the release carry one lump of variance, worth 8.0% of standard deviation; its weight falls as 1/T with the expiry. Illustrative quotes.
Figure 8.4. At-the-money term structure of a share around its earnings release (dotted). Expiries after the release carry one lump of variance, worth 8.0% of standard deviation; its weight falls as 1/T1/T with the expiry. Illustrative quotes.

উদাহরণ

Example 8.8 (An earnings week)

A share reports after the close on day 7. At-the-money volatilities are 32.0% for the expiry in 4 days, 56.1% in 11 days, 48.2% in 18 and 44.3% in 25. The event variance is 0.5612×11/365−0.322×11/365=0.00640.561^2\times11/365-0.32^2\times11/365=0.0064: a standard deviation of 8.0% for the move on the announcement, an expected absolute move of 8.0%×2/π=6.4%8.0\%\times\sqrt{2/\pi}=6.4\%. Removing it, the 18-day expiry’s volatility is 32.0%: the whole term structure beyond the event is one diffusive volatility plus one jump (Figure 8.4).

প্রসঙ্গসহ পড়ো →