সব বই

পেশাদার

1 Markets I: The Ecosystem and Exchange-Traded Marketsবাজার অনলাইন 2 Markets II: Rates, FX and Creditবাজার অনলাইন 3 Markets III: Commodities, Energy and Cryptoবাজার অনলাইন 4 Quantitative Methodsপদ্ধতি অনলাইন 5 Derivatives and Volatilityডেরিভেটিভস অনলাইন 6 Rates, Credit, XVA and Riskসুদহার, ঋণ ও ঝুঁকি অনলাইন 7 Research Craft: Predictors, Backtests, Measurement, Portfoliosগবেষণা অনলাইন 8 Strategies I: Equities and Futuresকৌশল অনলাইন 9 Strategies II: Volatility, Relative Value, Macro and the Bank Desksকৌশল অনলাইন 10 Microstructure and Executionএক্সিকিউশন অনলাইন 11 Market Making and High-Frequency Tradingমার্কেট মেকিং অনলাইন 12 Machine Learning for Marketsমেশিন লার্নিং অনলাইন 13 Low-Latency Softwareপ্রযুক্তি অনলাইন 14 Networks, Hardware and Trading Infrastructureপ্রযুক্তি অনলাইন 15 Research, Data and Risk Platformsপ্রযুক্তি অনলাইন 16 The Desk and the Firmপ্রতিষ্ঠান অনলাইন 17 The Industry: Firms, Roles and Careersক্যারিয়ার অনলাইন 18 Interviews I: Maths, Probability and Speedক্যারিয়ার অনলাইন 19 Interviews II: Markets, Trading Games and the Final Roundক্যারিয়ার অনলাইন 20 Interviews III: Codeক্যারিয়ার অনলাইন
অ্যাপ পরিচিতি Coach সাইন ইন পড়া শুরু করো

বইগুলো এখনো বাংলা ভাষায় পাওয়া যায় না — ইংরেজি সংস্করণ দেখানো হচ্ছে।

Quantitative Finance · পরিভাষা

Futures-to-cash lead, lead–lag estimator কী?

অন্য নাম: futures-to-cash lead · lead--lag estimator

Definition 10.4 Research Craft: Predictors, Backtests, Measurement, Portfolios · অধ্যায় 10 — Cross-Sectional and Cross-Asset Features

The futures-to-cash lead is the tendency of an index future’s price to move before the prices of the index’s constituents and of the funds that track it. A lead–lag estimator estimates the time shift ϑ\vartheta at which two price series are most related: here the lag maximising the Hayashi–Yoshida cross-covariance of one series with the other’s clock shifted by ϑ\vartheta, computed from all observations without synchronising them (Hoffmann, Rosenbaum and Yoshida, 2013).

Hayashi–Yoshida cross-correlation of two simulated instruments’ mid-prices, the second’s clock shifted by , for a planted latency of 0.5 seconds; normalised by one-minute realised variances. The fast pair’s function is flat-topped and centred on the latency; the slow pair’s price changes too rarely to show it. Data: firm.tape, one hour, seed 10.
Figure 10.3. Hayashi–Yoshida cross-correlation of two simulated instruments’ mid-prices, the second’s clock shifted by ϑ\vartheta, for a planted latency of 0.5 seconds; normalised by one-minute realised variances. The fast pair’s function is flat-topped and centred on the latency; the slow pair’s price changes too rarely to show it. Data: firm.tape, one hour, seed 10.
Estimated lead (symmetric centre of the Hayashi–Yoshida cross-correlation) against the planted latency, three seeds each, with the diagonal. Data: firm.tape, one hour per run.
Figure 10.4. Estimated lead (symmetric centre of the Hayashi–Yoshida cross-correlation) against the planted latency, three seeds each, with the diagonal. Data: firm.tape, one hour per run.
প্রসঙ্গসহ পড়ো →